Archive

(114 Total Articles)

Page 2 of 2.

Showing only:Jobs & Labor(31 entries)Clear filter
German semiconductor firm shutters Mesa plant, lays off workers

A German semiconductor company is closing a Mesa plant and cutting jobs. That points to a plant-level shutdown that affects local workers and suppliers tied to the site; the source does not say what led to the closure or what happens to the equipment or remaining operations.

Sep 15, 2026
Huge industrial park planned on Salt River Pima-Maricopa Indian Community land

A large industrial park is being planned on tribal land near the Salt River Pima-Maricopa Indian Community. For plants and suppliers, the main effect is new industrial sites; for the labor market, the excerpt does not say what kinds of jobs, wages, or hiring commitments are involved.

Sep 15, 2026
New industrial park in north Phoenix will support TSMC with 1K jobs

A new industrial park in north Phoenix is being built to support TSMC and is tied to about 1,000 jobs. The story points to more industrial space around the chipmaker, but it does not say what kind of tenants will fill the park, how many jobs are construction versus permanent, or what incentives or infrastructure changes may be involved.

Sep 15, 2026
[News] ASE’s SPIL Reportedly Nears Arizona Expansion as TSMC, Amkor Step Up U.S. Advanced Packaging Push

The story points to more U.S. packaging capacity being added in Arizona, with ASE’s SPIL joining a broader buildout around advanced packaging. That matters for plants and suppliers tied to semiconductor assembly, and it can add demand for skilled manufacturing labor in the state. The excerpt does not say whether the move is final, how large the expansion would be, or when work would start.

Sep 15, 2026
Biggs, Crane Back ASU Bid For New Army Manufacturing Center

The item says two lawmakers support Arizona State University’s bid to host a new Army manufacturing center. The story matters for plant siting and for workforce demand around military production, but the excerpt does not say what would be made, how many jobs are involved, or whether any site has been chosen.

Sep 15, 2026
TSMC’s Arizona project proceeds well but faces water, labor challenges

TSMC’s Arizona site is still moving ahead, but the main constraints are practical ones: water supply and the availability of workers. For plants, that means expansion can keep running into local utility limits and hiring pressure even when construction stays on track; for suppliers, it signals slower or more uneven ramp-up conditions; for the labor market, it points to continued demand for skilled manufacturing and construction workers in the region. The source does not say how severe the water shortfall is, what staffing gaps remain, or whether the company has a fix in hand.

Sep 15, 2026

Showing 26–31 of 31

← PreviousPage 2 of 2Next →